Fri, 07/28/2017 - 09:00
заэс

Overhaul of the Steam generator safety valves (pulse-safety devices of the SGSV) manufactured by Weir Power & Industrial France (Sebim) (WPI France) with the simultaneous replacement of the piping was carried out at the power unit No. 3 of Zaporizhzhya NPP, which is currently in its planned outage for maintenance.


As of the time 07/11/2020 - 12:07

Performance indicators
Power Unit №1 -
Power Unit №2 675 MW
Power Unit №3 863 MW
Power Unit №4 -
Power Unit №5 -
Power Unit №6 976 MW
Total plant load 2514 MW
Radiation conditions
Industrial ground 0.1 μSv/h
Energodar 0.08 μSv/h
Meteorological state
Air temperature 28.4
Wind NE
Wind speed 4 m/s
Relative humidity 32 %
Atmospheric pressure 762 mm Hg