EIA
- Report about transboundary consultations based upon results of SE "Zaporizhzhia NPP" and SE "South-Ukrainian NPP" environmental impact assessment.
- EIA. Report: Development of materials on Zaporizhzhia NPP operation environmental impact assessment (at the present time the document passes ecological expertise in Ministry of ecology and national resources of Ukraine).
- Development of materials on impact of Zaporizhzhia NPP operation on environment. Nontechnical summary.
- Nontechnical summary. Report «Development of materials on impact of Zaporizhzhia NPP operation on environment». Transboundary impact of production activity on environment.
ZNPP Power Unit 5
- Public discussions of the draft decision made by the State Nuclear Regulatory Inspectorate of Ukraine about the possibility of extending the operational life of Zaporizhzhia NPP Unit 5
- Report on public discussions of the draft decision
- Shorthand record of public consultations about the draft decision
- Protocol of public consultations about the draft decision
- List of propositions (comments) received by the State Nuclear Regulatory Inspectorate in the course of public discussions, as well as data on registration or rejection of propositions (comments)
- Report on implementation of public hearings/public meeting for consideration of materials for substantiation of safety of SE “Zaporizhzhia NPP” power unit № 5 operational life extension for over the design period
- Untechnical Summary. Safety Justification Materials for Extension of ZNPP Units 5 Life Time during Over-Design Period
- Periodic safety review. Safety factor 14 – impact of the operation on the environment
- Integrated safety analysis of ZNPP Power Unit 5 (revision dated 11/25/20)
- SE ZNPP ecological audit report
- SE ZNPP ecological audit conclusions
- Application for making amendments in the License for activities during the lifecycle "Nuclear facility operation" – Power unit 5
ZNPP Power Unit 3 and Power Unit 4
- Public discussions of the draft decision made by the State Nuclear Regulatory Inspectorate of Ukraine about the possibility of extending the operational life of Zaporizhzhia NPP Unit 4
- Report on public discussions of the draft decision
- Shorthand record of public consultations about the draft decision
- Protocol of public consultations about the draft decision
- List of propositions (comments) received by the State Nuclear Regulatory Inspectorate in the course of public discussions, as well as data on registration or rejection of propositions (comments)
- Public discussions of the draft decision made by the State Nuclear Regulatory Inspectorate of Ukraine about the possibility of extending the operational life of Zaporizhzhia NPP Unit 3
- Report on public discussions of the draft decision
- Shorthand record of public consultations about the draft decision
- Protocol of public consultations about the draft decision
- List of propositions (comments) received by the State Nuclear Regulatory Inspectorate in the course of public discussions, as well as data on registration or rejection of propositions (comments)
- Questions/answers for preparation of public hearings
- Report on implementation of public hearings/public meeting for consideration of materials for substantiation of safety of SE “Zaporizhzhia NPP” power unit № 3 operational life extension for over the design period
- Report on implementation of public hearings/public meeting for consideration of materials for substantiation of safety of SE “Zaporizhzhia NPP” power unit № 4 operational life extension for over the design period
- Untechnical Summary. Safety Justification Materials for Extension of ZNPP Units 3 and 4 Life Time during Over-Design Period
- Periodic safety review. Safety factor 14 – impact of the operation on the environment
- Integrated safety analysis of ZNPP Power Unit 3 (revision dated 09/26/17)
- Integrated safety analysis of ZNPP Power Unit 4 (revision dated 09/04/18)
- Integrated safety analysis of ZNPP Power Unit 4 (revision dated 09/04/18 - in the Ukrainian language)
- Chapter 5 «Conclusions in part of possibility of ZNPP Unit 4 further operation» of the Unit 4 Integrated Safety Assessment (revision dated 09/04/2018)
- SE ZNPP ecological audit report
- SE ZNPP ecological audit conclusions
- Application for making amendments in the License for activities during the lifecycle "Nuclear facility operation" – Power unit 3
- Application for making amendments in the License for activities during the lifecycle "Nuclear facility operation" – Power unit 4
ZNPP Power Unit 1 and Power Unit 2
- Public discussions of the draft decision made by the State Nuclear Regulatory Inspectorate of Ukraine about the possibility of extending the operational life of Zaporizhzhia NPP Unit 1
- Report on public discussions of the draft decision
- Shorthand record of public consultations about the draft decision
- Protocol of public consultations about the draft decision
- List of propositions (comments) received by the State Nuclear Regulatory Inspectorate in the course of public discussions
- List of propositions (comments) announced in the course of public consultations, as well as data on registration or rejection of propositions (comments)
- Public discussions of the draft decision made by the State Nuclear Regulatory Inspectorate of Ukraine about the possibility of extending the operational life of Zaporizhzhia NPP Unit 2
- Report on public discussions of the draft decision
- Shorthand record of public consultations about the draft decision
- Protocol of public consultations about the draft decision
- List of propositions (comments) received by the State Nuclear Regulatory Inspectorate in the course of public discussions
- About "Report on public consultation regarding the materials of service life extension safety substantiation for Zaporozhye NPP Units 1, 2 after the designed period"
- Report about public discussion of materials concerning substantiation of safety of SE Zaporizhzhia NPP power units № 1, 2 operational life-time extension over the design-based period
- Periodic safety review. Safety factor 14 – impact of the operation on the environment
- Integrated safety analysis of ZNPP Power Unit 1 (revision dated 08/03/16)
- Integrated safety analysis of ZNPP Power Unit 2 (revision dated 08/16/16)
- Untechnical Summary. Safety Justification Materials for Extension of ZNPP Units 1 and 2 Life Time during Over-Design Period
- SE ZNPP ecological audit report
- SE ZNPP ecological audit conclusions
- Application for making amendments in the License for activities during the lifecycle "Nuclear facility operation" – Power unit 1
- Application for making amendments in the License for activities during the lifecycle "Nuclear facility operation" – Power unit 2