Mon, 04/06/2020 - 16:00
Yuriy Kulba was appointed to the position of Acting General Manager of Zaporizhzhia NPP by the Order of the State Enterprise “NNEGC “Energoatom”, dated April 02, 2020

Yuriy Kulba graduated from Bauman Moscow Higher Technical School with degree in Energy Machines and Installations.

After graduation in 1984, he was accepted to the position of Reactor Operator at Zaporizhzhia NPP Reactor Department. He worked at all the stages of operational management at Operations Department, from the Reactor Department Shift Supervisor to the Deputy Technical Director for Operations – Operations Department Head.


Mon, 03/16/2020 - 12:00
New appointment at Zaporizhzhia NPP

By the Order of Zaporizhzhia NPP dated March 13, 2020, No. 768-k, Deputy Chief Engineer for Technology and Engineering Igor V. Murashov was transferred to the position of Chief Inspector.

Igor V. Murashov has a higher education, degree: "Engineer for operation and repair organization". In 1998 he started working at Zaporizhzhia NPP as the 6th group Reactor Operator, Operations Department, after graduation from Sevastopol Institute of Nuclear Energy and Industry.


As of the time 08/10/2020 - 08:06

Performance indicators
Power Unit №1 -
Power Unit №2 677 MW
Power Unit №3 989 MW
Power Unit №4 -
Power Unit №5 -
Power Unit №6 980 MW
Total plant load 2646 MW
Radiation conditions
Industrial ground 0.07 μSv/h
Energodar 0.09 μSv/h
Meteorological state
Air temperature 24.8
Wind NE
Wind speed 2.1 m/s
Relative humidity 52 %
Atmospheric pressure 758 mm Hg